Overview
Built on time
and on budget
Lipman Pty Ltd was engaged to design and construct this facility to house specialist manufacturing equipment. The 13 metre high concrete-framed structure, built on time and within budget, is clad with vertical precast concrete panels.
Client
3M Australia Pty Ltd
Address
2-74 Dunheved Circuit, St Marys
Sector/s
Contract
Design and Construct
Value
$5M
You may also be interested in…
