AUGUST 19 2020 • NEWS

The Anglicare Liverpool project is in full swing, with the building expected to Top-Out at the end of this month. As the project grows taller, the site is also powering through the delivery and installation of over 140 bathroom pods across 11 floors.
These prefabricated bathrooms require little onsite attention and have considerable time-saving outcomes for the project overall, just one way Lipman has introduced prefabrication to our construction process to reduce time and as a result a reduction in costs for our clients too.