Home > News > Prefabricated Bathroom Pods Installed at Anglicare Liverpool Project
Prefabricated Bathroom Pods Installed at Anglicare Liverpool Project

Prefabricated Bathroom Pods Installed at Anglicare Liverpool Project

August 19, 2020

The Anglicare Liverpool project is in full swing, with the building expected to Top-Out at the end of this month. As the project grows taller, the site is also powering through the delivery and installation of over 140 bathroom pods across 11 floors.

These prefabricated bathrooms require little onsite attention and have considerable time-saving outcomes for the project overall, just one way Lipman has introduced prefabrication to our construction process to reduce time and as a result a reduction in costs for our clients too.

News & Updates

View All Articles

Subscribe for upcoming news and events

  • This field is for validation purposes and should be left unchanged.

Contact

+61 2 9955 7000
lipman@lipman.com.au
Level 6, 66 Berry Street,
North Sydney
Locked Bag 2106
North Sydney NSW 2060

Licence

Builder’s License 27970
ABN 84 001 548 830