Bridgepoint Pedestrian Bridge Upgrade, Mosman

Client

oOh! Media

Location

1 - 3 Brady Street, Mosman

Value

$1.8M

Contract

Lump Sum

Project Description

Updgrade of an existing pedestrian bridge linking 2 buildings either side of Military Road. The existing bridge was stripped to bare concrete structure and rebuilt to create a new glass enclosure and facilitate 2 new supersite advertising signs. The external facade of the bridge is clad with horizontal alpolic louvres.

 

News & Updates

View All Articles

“The innovation and focus put forward by Lipman to the construction process we found was excellent. The collaboration and cooperation by Lipman throughout the whole project, resulted in a superb outcome.

Lipman as a construction company has shown a depth of maturity and talent, that is both on one hand representing their age in this very difficult construction industry but also their ability to support the youth and enthusiasm coming up through the ranks.”

David Hughes – Director at Crown Project Services

View All Testimonials

Subscribe for upcoming news and events

  • This field is for validation purposes and should be left unchanged.

Contact

+61 2 9955 7000
lipman@lipman.com.au
Level 6, 66 Berry Street,
North Sydney
Locked Bag 2106
North Sydney NSW 2060

Licence

Builder’s License 27970
ABN 84 001 548 830